Detail Design for Improvement to Daund-Karmala-Paranda-Barshi to Osmanabad Road District border Km 208/160 to Km 250/155 (Waradwadi Pahata to Narewadi district border excluding Barshi municipal limit length-6.77 Km) Distt. Solapur (SH-68 Length-35.225 Km Project on EPC basis)
SH : Topographical survey (35.25 Km)
Client: PWD Maharashtra
Consultant: Merell Road Solution Pvt. Ltd, New Delhi
————————————————————————————————————————————————————————————————————————————————
Client: PWD Maharashtra
Consultant: Merell Road Solution Pvt. Ltd, New Delhi
Consultancy services for preparation of DPR for Kerala/ Karnataka Border to Vangalam section from Km 17.200 to km 230.000 of NH-17(New NH66)
SH : Topographical survey (90 Km)
Client: NHAI
Consultant: Aecom India Pvt. Ltd., Gurgaon
————————————————————————————————————————————————————————————————————————————————
Consultancy services for Preparation of Feasibility Report and Detailed Project Report for Punjab/Haryana Border to Moonak-Jakhal-Budhlana-Bhiki from km 247+150 to Km 287+710 section of NH-148B & 20+550Km portion of Fatehabad-Ratia-Budhlana on BOT/EPC/Hybrid/Annuity Mode
SH :Topographical survey (40.56 Km)
Client: NHAI
Consultant: Indian Technocrats Limited, New Delhi
————————————————————————————————————————————————————————————————————————————————
Rehabilitation and Up-gradation of 2-lane with paved shoulders configuration and strengthening of Fatuah-Harnaut-Barh Section from Km 0.000 to Km 69.000 of NH-30 in the state of Bihar under National Highways inter-connectivity improvement projects NHIIP to be executed on EPC Basis
SH :Topographical survey (69 Km)
Client: NHAI
Consultant: MRS Infratech, New Delhi
————————————————————————————————————————————————————————————————————————————————
Prepration of Detailed Project Report for up gradation of the Stretch Giddalur-Cumbum-Thokapalli-Vinukondla-Narasaraopet
in the State of Andhra Pradesh to two/four lane with paved shoulder configuration (Package No. NH/IAHE/26)
SH :Topographical survey (93 Km)
Client: Indian Academy for Highway Engineers (IAHE), Noida
Consultant: Stup Consultants Pvt. Ltd., New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for selected stretches of roads under BRT Scheme (i) Varanasi-Jaunpur- Ayodhya road (ii) Mirzapur – Aurai road (Total 240 Km) in the state of Uttar Pradesh
SH :Topographical survey (240 Km)
Client: NHAI
Consultant: Holtec Consulting Pvt. Ltd., Gurugram
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for Four Laning of Tumkur – Shimoga section (80Km) of NH-206 in the state of Karnataka
SH :Topographical survey (80 Km)
Client: NHAI
Consultant: URS Scott Wilson India Ltd., Gurugra
————————————————————————————————————————————————————————————————————————————————
Widening and Strengthening of Balotra – Jalore – Ahore – Sanderao section (120 Km) in the state of Rajasthan
SH : Topographical survey (120 Km)
Client: IAHE, Noida
Consultant: Holtec Consulting Pvt. Ltd., Gurugram.
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for Four Laning of Rupnagar – Phagwara section of NH-344A in the state of Punjab
SH : Topographical survey (80 Km)
Client: NHAI
Consultant: Indian Technocrat Ltd., New Delhi
————————————————————————————————————————————————————————————————————————————————
Widening
and Strengthening of Barmer – Sanchore
section (Upto Ganghav Bridge) of NH-15 from Km 153 to 157 (106 km) in the state of Rajasthan
SH :
Topographical survey (106 Km)
Client:
Monte Carlo Limited
————————————————————————————————————————————————————————————————————————————————
Consultancy services for Preparation of DPR for rehabilitation and upgradation of NH-109 from Rudraprayag to Gaurikund (Km 00 to km 76) in the state of Uttrakhand
SH : Topographical survey (76 Km)
Client: NHAI
Consultant: URS Scott Wilson India Ltd., Gurgaon
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for Four Laning of Palwal – Sohna – Bhiwadi section of NH-71B (Km 26.95 to Km 78.94) in the state of Haryana
SH : Topographical survey (52 Km)
Client: PWD, Haryana
Consultant: Holtec Consulting Pvt. Ltd.
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for Four Laning of Solapur – Yedshi section of NH-211 (Km 0-98) in the state of Maharashtra
SH : Topographical survey (98 Km)
Client: IRB
Consultant: Stup Consultants Pvt. Ltd, Mumbai
————————————————————————————————————————————————————————————————————————————————
Feasibility study and Preparation of Detailed Project report for improvement and Upgradation to 2 lane/ 2 lane with paved shoulders configuration of 68 km road in Jharkhand (Package SHAJ/DPR-3/2012-8)
SH : Topographical survey (68 Km)
Client: State Highways Authority of Jharkhand (SHAJ)
Consultant: Holtec Consulting Private Ltd, Gurgaon
————————————————————————————————————————————————————————————————————————————————
Feasibility study and Preparation of Detailed Project report for improvement and Upgradation to 2 lane/ 2 lane with paved shoulders configuration of 87km of road in Jharkhand (Package SHAJ/DPR-3/2012)
SH : Topographical survey (87 Km)
Client: State Highways Authority of Jharkhand (SHAJ)
Consultant: Holtec Consulting Private Ltd, Gurgaon
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for Rahabilitation and Upgradation of Kaithal-Jind-Hisar- Rajasthan Border section of NH-65
SH : Topographical survey (66 Km)
Client: Concessionaire
Consultant: Scott Wilson India Pvt. Ltd, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of Detailed Project report for Four Lanning of Warora- Chandrapur- Ballarpur section (66Km) of NH-264
SH : Topographical survey (66 Km)
Client: Concessionaire
Consultant: Scott Wilson India Pvt. Ltd, Gurugram
————————————————————————————————————————————————————————————————————————————————
Feasibility Studies cum preliminary Design for Four Lanning of Km161 to Km260 of NH-17 (Bombay- Goa Section)
SH : Topographical survey (99 Km)
Client: National Highways Authority of India (NHAI)
Consultant: Voyants Solutions Pvt. Ltd, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for upgradation of Meerut–Hapur- Bulandshahr Section of NH-235 and Meerut- Nazibabad Section of NH-119
SH : Topographical survey (75 Km)
Client: National Highways Authority of India (NHAI)
Consultant: URS Scott Wilson India Pvt. Ltd, Gurugram
————————————————————————————————————————————————————————————————————————————————
Feasibility Studies for 8 Lane access controlled expressway on Right Bank of Upper Ganga Canal
SH : Topographical survey (110 Km)
Client: UPEIDA/ IL&FS
Consultant: URS Scott Wilson India Pvt. Ltd, Gurugram
————————————————————————————————————————————————————————————————————————————————
Feasibility Studies for Six Lanning of Chandikhole-Paradip section of NH-5A
SH : Topographical survey (75 Km)
Client: National Highways Authority of India (NHAI)
Consultant: Meinhardt Singapore Pte. Ltd, New Delhi
————————————————————————————————————————————————————————————————————————————————
Feasibility Studies for Two Lanning of Jaipur-Nagaur section.
SH : Topographical survey (240 Km)
Client: RSIDC, Jaipur
Consultant: Scott Wilson India Pvt. Ltd., New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning from Km, 04 to km 217 (213 km) of NH 59 (Ahmedabad-Gujrat-MP Border) Section
SH : Topographical survey (213 Km)
Client: NHAI
Consultant: Scott Wilson, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of 80 km of NH 3 (Gwalior – Shiv Puri section)
SH : Topographical survey (80 Km)
Client: NHAI
Consultant: Scott Wilson, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of 100 km of NH – 3 (Kalghat- MP Maharastra Border section)
SH : Topographical survey (100 Km)
Client: NHAI
Consultant: Scott Wilson, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of 200 km of State Highway in Chhattisgarh
SH : Topographical survey (200 Km)
Client: PWD Chhattisgarh
Consultant: Scott Wilson, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of km 0 to 70 of NH-57 (Darbangha- Muzaffarpur section)
SH : Topographical survey (70 Km)
Client: NHAI
Consultant: Mahindra Raj Consultants, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of km 28 to 75 of NH-75 (Gwalior – Jhansi section and Gwalior bypass)
SH : Topographical survey (47 Km)
Client: NHAI
Consultant: Engineers and Management Associates, New Delhi.
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of km 140 to 180 of NH-25 (Jhansi – Bhognipur section)
SH : Topographical survey (40 Km)
Client: NHAI
Consultant : EMA Unihorn Pvt. Ltd, New Delhi
————————————————————————————————————————————————————————————————————————————————
Preparation of DPR for four laning of km 270 to 316 of NH-47 (Trichur – Angamali section)
SH : Topographical survey (46 Km)
Client: NHAI
Consultant : Meltech Infrastructure Engineers Ltd, Hyderabad.
————————————————————————————————————————————————————————————————————————————————
Feasibility studies for rehabilitation of km 152 to 217 of NH-58 and km155 to 197 of NH-72 (UP Border-Haridwar-Dehradun Section) in the state of Uttaranchal
Client: MORTH
Consultant: Stup Consultants Ltd, New Delhi
————————————————————————————————————————————————————————————————————————————————
Widening and strengthening of 400 Kms State highways in the state of Madhya Pradesh
SH : Topographical survey (400 Km)
Client: Public Works Department (MP)
Consultant: Artefact Projects, Nagpur
————————————————————————————————————————————————————————————————————————————————
Four Laning and Strengthening of NH-2 (Khaga to Varanasi section of Golden Quadrangle including new Bridge over River Ganga on Allahabad Bypass ) (WB Funded)
SH : Topographical survey (90 Km)
Client: National Highway Authority of India
Consultant: EMA- SNC Lavalin, Canada
————————————————————————————————————————————————————————————————————————————————
Construction supervision for Four Laning and Strengthening of NH-2 (Km 38 to 115 of Golden Quadrangle) (WB Funded) Kanpur- Allahabad Section
SH: Topographical survey (77Km)
Client: National Highway Authority of India
Consultant: BCEOM, New Delhi.